Herschel

first_imgINVERNESS COUNTY: Trunk 19 Trunk 19, from Mabou Harbour Bridge southerly, will have a one-lane closure for patching and repaving from today, Aug. 22 to Monday, Oct. 31. Traffic control consists of traffic control persons and a pilot vehicle. Work takes place from 6 a.m. to 8:30 p.m. Local Area Office: 902-543-7376 Fax: 902-543-5596 Local Area Office: 902-625-4200 Fax: 902-625-1946 LUNENBURG COUNTY: Highway 103 Highway 103 will have alternating one-lane closures for repairs and repaving from one kilometre west of Exit 14, westerly 3.5 kilometres, from today, Aug. 22 until Friday, Sept. 23. Traffic control consists of a pilot vehicle, flashing light unit, barrels, and traffic cones. RICHMOND COUNTY: Point Tupper Industrial Park Point Tupper Industrial Park Road, from Nova Scotia Power to the entrance of the new Anadarko LNG facility, will have a one-lane closure for gravelling and repaving from today, Aug. 22 to Monday, Oct. 31. Traffic control consists of traffic control persons and a pilot vehicle. Work takes place from 7 a.m. to 7 p.m. INVERNESS COUNTY: Highway 105 Highway 105, from about 3.7 kilometres west of Exit 4 to the west end of Indian March Bridge (Sky River), will have a one-lane closure for patching and repaving from today, Aug. 22 to Monday, Oct. 31. Traffic control consists of traffic control persons and a pilot vehicle. Work takes place from 6 a.m. to 8:30 p.m. Local Area Office: 902-625-4200 Fax: 902-625-1946 Local Area Office: 902-625-4200 Fax: 902-625-1946 -30-last_img read more